Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year or 2000 Hours |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
King Power, established in 1994, after more than 30 years' development, has turned into a top level in diesel and gas generator manufacturer in China. Till now, King Power has achieved more than 29 patents. It has been authorized as the high-tech enterprise with 100 million RMB registered fond and more than 80000 square meters factory area. King Powr provides solutions to gas generator, biogas generator, coal-bed gas generator, biomass generator, the CHP system, etc. And committed to become a pioneer in gas and diesel power industry.
210KVA Biogas Generator set for chicken farm or sewage-treatment plant
Basic Specification
Generator Engine: KingPower/CNMINS/Yuchai/Weichai/Deutz
Generator Alternator: Marathon, Leroy Somer, Robot, Engga, etc.
Generator Controller: KP720Z, DS9610B
Gas Mixer: King Power;
Ignition System: ECU(King Power), Altronic
Governor: King Power, Woodward
Generator Rated Voltage: Low / High voltage
Rated Voltage: 460/415/400/380V/220V
Maximum Power: >70
Output Type: AC Three Phase
Frequency: 50Hz/60Hz
Rate: 1500r/1800r
Certification: CE, ISO9001
Genset Information
1. Intelligent and reliable ignition and speed control systems.
2. 38% electricity efficiency.
3. Can be operated for 24 hours without stop.
4. lots of oversea project cases.
5. Built-in damper for anti-vibration.
6. Full range protection function and alarm shutdown feature.
7. Supply of all the necessary spare parts.
8. OEM quality promise.
9. 20000 hours over-haul period.
10. Low maintaining cost.
Alternator Feature
1. Customer-made low or medial or high voltage.
2. IP21-23 enclosure is standard for all industrial alternators.
3. The insulation system is Class H.
4. Simple installation and maintenance, with easy access to terminals, rotating diodes and coupling bolts.
5. Wide range of flange adapters and single bearing disc coupling.
6. Standard 2/3 pitch windings avoid excessive neutral currents.
7. AVR auto voltage regulator, auto exciter, auto adjustment.
8. Brush-less, 4 poles, rotation magnet.
Standard Accessory
Ignition & speed control system, Steel base frame, 3 meters smoke pipe, Exhaust silencer, Flanges, Bellows, Battery and connecting wires,
Operation manual and documents, Load test report, Water temperature sensor, Oil-pressure sensor, MCCB, Control panel, Maintaining tools, etc.
Optional Accessory
Gas Solenoid Valve, Pressure reducing valve, Pressure gauge, Fire retardant valve, Gas mixer, Engine coolant and oil heater, Alternator space heater, Heat exchanger, Remote control system with RS232/485 communication interface, Floating battery charger, Fuel-water separator, ATS, VTS, Paralleling system, Synchronizer, Moving trailer or wheels, Sound-proof canopy, Water-proof canopy, Extra spare parts.
ATS System
If the generator set will be used as a standby power, the auto transfer switch (ATS) is necessary and essential. Because ATS can automatically transfer load from Mains power to generator set. In normal, when the Main power fails or voltage drops below 80% of the normal voltage, ATS will auto start standby generator set after a preset time of 0-10 sec (adjustable according to the users). Once generator reaches at rated speed, the ATS will transfer the load to standby generator sets automatically.
1.Over 30 years' experience in gas genset; National High-Tech Enterprise;
2. Multiple choices: KINGPOWER brand gas engines, MWM,Yuchai,Cumins gas engines;
3. Perfect genset configuration: pressure reduce valve, solenoid valve, gas mixer, pressure gauge,desulfurizers, frequency
converter, booster pump, etc.;
4. Widely used in farming and animal husbandry, coalbed methane mining, landfill, hotels, etc;
5. Independent research and development team to ensure the quality and warranty;
6. Free choice for international or KINGPOWER ignition and speed control system;
7. Separated pipeline gas load testing room;100% load test before delivery;
Package & Payment & Delivery Date
Package: EPE/ Ply-wood packing.
Payment term: 30% T/T as deposit, 70% balance shall be paid before delivery. Or 100% irrevocable L/C at sight.
Price term: FOB, CFR, CIF, EXW
Delivery time: 20-35 working days after getting the deposit
Quality Warranty Period
One year or 1000hours from the genset's delivery from the seller, subject to whichever comes first. Customers can have get the warranty from both the engine or alternator suppliers and also from King Power during the warranty period. We promise to test every generator set before delivery.
After-sale service
King power provides free technical support and spare parts during the warranty period. We can also provide support to the customers, if the customers need us to help fix the installation or commission, only charging the necessary fees. All life-span technical support on line can be offered freely.
1.Q: What is your minimum order quantity for this product?
A: 1 Set.
2. Q: What is your generator power range?
A: 10kw-5000kw.
3. Q: Is it okay to make the customer's own brand?
A: We can be your OEM manufacturer.
4. Q: What is the delivery time?
A: The fastest 15 working days after receiving the 30% T/T deposit.
5. Q: Where is your loading port?
A: Shenzhen port or according to customers' requirement.
6. Q: What is your company's available production capacity?
A: 500 units per year.
7.Q: What is the warranty period?
A: 12 months after shipment or 1000 working hours.